The guide
The pilot review is where most enterprise AI value is lost — not in the model, but in the decision. Pilots are extended by default because nobody wrote down what success meant; they are scaled on time-saved figures that never become money; they are killed without anyone recording what was learned. A well-run pilot ends in one of four decisions — scale, extend, pivot or kill — made against exit criteria agreed before the pilot started, and tested through all Six Lenses. This guide is what the CAIO asks, requires and decides at that review.
This guide is the CAIO's judgment. The operated workflow — gates, owners, records and handoffs — is Process: Experimentation and Production Transition and the Stage-Gate Delivery runbook. For agent pilots, the agent-specific exit test (scope held, stop works, owner active, cost bounded, paired metric intact) in Agent Governance by Autonomy Tier applies in addition to this one. Drill it with Practicum: The Cost Gate.
Madrona, Aug 2026, n=150
PwC CEO Survey, Jan 2026, n=4,454
Futurum Research, Sep 2026, n=1,636
Gartner, Jun 2025
Four outcomes, not two
A pilot review framed as "go or no-go" produces the worst outcome by default: the pilot that is neither, extended for another quarter because stopping feels like failure and scaling feels premature. Name all four outcomes and give each one its own requirements.
| Decision | Means | Requires | How it is abused |
|---|---|---|---|
| Scale | Fund and move to production at the target population | All exit criteria met; no blocks; production economics positive at a signed conversion rate. Any remaining conditions are ramp conditions with an owner, a date and an automatic hold or rollback — a condition on a gate criterion makes the decision an extend, not a scale (see Process: Experimentation and Production Transition) | Scaling on enthusiasm, a good demo, or a time-saved number with no conversion owner |
| Extend | Continue the pilot for a fixed period to answer a named question | The unanswered question, the evidence that will answer it, a date (≤90 days) and a capped budget. A stage gets one extension, with a reason; there is no second (Process 12) | The "zombie pilot": extended because nobody wants to decide. An extension without a named question is a deferred kill |
| Pivot | Change scope, population, autonomy level or use case, then re-pilot | A finding that shows where the value actually is, or a block that a narrower design clears | Renaming the same pilot to reset the clock |
| Kill | Stop, decommission and record what was learned | A short learning record: what was tested, what was found, what would make it worth revisiting | Killing quietly, so the next team repeats the pilot from scratch |
Criteria written after the results arrive will fit the results. The CAIO's single most effective control over pilots is refusing to start one without written exit criteria for each lens, a baseline measured before go-live, an end date, and a budget. If a pilot already running has none, it uses its single extension to set them — and then must be decided: scale, pivot or kill.
The vocabulary maps onto the Stage-Gate Delivery runbook's three gate words: scale is a pass into the production gate, extend and pivot are a recycle with a named question or a redesign, and kill is a kill.
The exit criteria, lens by lens
| Lens | Passes when | Fails when |
|---|---|---|
| Value & economics | The primary metric moved beyond normal variation against a baseline measured before go-live, on a comparable population and period, and the paired quality metric held. Unit cost is measured per transaction and projected to production volume; the full run cost is counted; net value is positive at a conversion rate the owner has signed (the economics test below) | The baseline was reconstructed afterwards; the pilot group was volunteers or enthusiasts; quality was not measured, or fell. Costs ran on vendor credits; only license or token cost is counted; the benefit is time saved with no conversion owner |
| Security | Threat model done; the trifecta assessed; red-team findings closed or accepted in writing; permissions scoped to production | The pilot ran with broad or borrowed credentials; untrusted inputs were never tested |
| Governance | Tier confirmed; the production approver has the authority; documentation for that tier is complete | The pilot's informal sponsor is assumed to be the production approver |
| Data | Rights confirmed for the production data and purpose, not just the pilot sample; quality tested on representative data | The pilot used a cleaned extract, or data whose production rights nobody checked |
| Vendor & operations | An evaluation suite exists and gates changes; monitoring and a tested fallback are in place; production terms reviewed | The vendor's demo environment or trial terms are the only ones anyone has read |
| People | Adoption measured by behavior in the target roles; managers expect the new workflow; any workforce effect agreed with HR | Adoption is "logins"; a headcount saving is assumed before the benefit is verified |
The economics test
This is the economics half of the Value & economics lens. Pilot economics are flattering by construction. The users are self-selected, the volumes are small, the vendor is often subsidizing the compute, and the costs that dominate in production — integration, evaluation, monitoring, support, change management, rework from quality loss — have not arrived yet. The CAIO's job at the pilot review is to translate pilot numbers into production numbers before anyone commits to them.
| Pilot number | What it hides | Production adjustment |
|---|---|---|
| Time saved per task | Whether the time becomes money; extra rework from lower quality | Subtract the cost of the quality change; multiply by a conversion rate the owner signs |
| Cost per user per month | Enthusiast usage; usage growth once it is normal; agentic loops whose cost varies by task | Measure cost per transaction; project at production volume with a ceiling (see AI Unit Economics & Inference Cost) |
| Token or license cost | Credits and trial pricing; the run costs around the model | Use list or contracted price; add evaluation, monitoring, support and the platform share |
| Accuracy on the pilot sample | A cleaned or unrepresentative sample; seasonal or cohort effects | Re-test on representative production data, by cohort, before scale |
| Sponsor's benefit projection | Overlap with other initiatives' claims on the same capacity or revenue | Check the portfolio for double counting before the benefit enters the plan (see Benefits Realization) |
Volume × improvement per item, from the pilot, against the pre-pilot baseline.
Rework, reopens, escalations or errors added by the change, priced the same way.
The share the conversion owner signs as becoming owned value, and how.
Model, platform, evaluation, monitoring, support — at production volume.
Payback, plus the break-even conversion rate — the single most useful number in the review.
The decision flow
flowchart TD
A(["Pilot reaches its review date"]):::term --> B{"Criteria set before start?"}
B -->|"no"| C["Extend only to set criteria and baseline"]
B -->|"yes"| D{"Any lens blocks?"}
D -->|"yes"| E{"Narrower design clears it?"}
E -->|"yes"| F["Pivot and re-pilot"]
E -->|"no"| G["Kill and record the learning"]:::kill
D -->|"no"| H{"Net value positive at signed conversion?"}
H -->|"no"| I{"Named question could change it?"}
I -->|"yes"| J["Extend with question, date, budget"]
I -->|"no"| G
H -->|"yes"| K["Scale: limited production, ramp conditions only"]:::ok
classDef kill fill:#f6ebea,stroke:#b86d6c,color:#8f3a38
classDef ok fill:#edf6ef,stroke:#6f8f86,color:#2f6747
classDef term fill:#26304a,stroke:#26304a,color:#ffffffWalkthrough: Meridian's support response assistant
Step 1 — gross improvement. 4 minutes × 120,000 = 480,000 minutes = 8,000 hours. At $45, that is $360,000 of capacity a year. Note that the sponsor's $480k projection already exceeds what the pilot measured.
Step 2 — quality cost. Two extra points of reopens = 2,400 more reopened items a year. Assuming (stated assumption, not case data) each costs one full baseline handling of 12 minutes: 480 hours × $45 = $21,600, before any customer impact, which is unpriced. Net capacity: $338,400.
Steps 3–5 — conversion, run cost, payback. Capacity becomes value only if Customer Support converts it — for example by absorbing forecast volume growth without the hiring it would otherwise need. Break-even against the $120k run cost is 120,000 ÷ 338,400 = 35.5% conversion.
| Conversion signed by owner | Owned value | Net of $120k run cost | Payback on $180k |
|---|---|---|---|
| 25% | $84,600 | −$35,400 | Never |
| 35.5% (break-even) | $120,000 | $0 | Never |
| 50% | $169,200 | $49,200 | 3.7 years |
| 75% | $253,800 | $133,800 | 1.3 years |
| 100% | $338,400 | $218,400 | 0.8 years |
The lenses. Value & economics: condition — explain the reopen rise (sample, cohort and period comparability) and bring it to 4.5% or below (the 4% baseline plus a 0.5-point tolerance); and a named conversion owner and mechanism, signed at 50% or more. Security: condition — the assistant retrieves over inbound customer emails and documents, so test for indirect prompt injection (the EchoLeak pattern); human approval of sending limits the blast radius. Governance: note — medium tier, human-approved output, documentation in place. Data: condition — the case does not establish customer-data rights for production use; the General Counsel must confirm them before any scale decision, with the evidence due by day 60. Unconfirmed rights are missing evidence, not a refusal; a refusal would be a block, and the pilot would pivot. Vendor & operations: condition — no evaluation suite is described; one must gate model and prompt changes. People: condition — no workforce action until the benefit is verified, and the reopen root cause is understood by the team leads.
Decision: extend 60 days, with a $30k cap and three named questions — (1) customer-data rights confirmed for production, (2) reopen rate at or below 4.5% with the cause explained, (3) a conversion owner signs a mechanism at ≥50%. Re-decide at day 60. What would change it: if data rights are refused, pivot to internal knowledge content only; if no owner will sign above the 35.5% break-even, kill — or pivot to a quality-focused use where the value is fewer reopens, not fewer minutes.
What the public record teaches
| Case | The pilot decision it teaches |
|---|---|
| McDonald's ends its IBM drive-thru test (June 2024) | A clean kill against a pre-set bar. After a test in about 100 restaurants, McDonald's told franchisees the automated order taker would be switched off by 26 July 2024. Reporting cited accuracy below the company's target, and the company said it would keep looking for a voice-ordering solution and keep IBM as a partner elsewhere. Kill the implementation, not the ambition — and keep the learning. |
| Klarna (2024–2025) | Scaling on the activity metric. Containment was paired with quality only once, at launch, and the pair was not tracked afterwards; the reversal came a year later. Never let a pilot pass on its primary metric alone. |
| Uber's coding-agent rollout (2025–2026) | Scaling without a meter. Adoption reached 84% and its 2026 AI coding-tools budget was reportedly spent in about four months, followed by a hard per-employee cap. Production economics must be projected and capped before scale. |
| Commonwealth Bank of Australia (2025) | A workforce action resting on an unverified pilot benefit, reversed with an apology. The benefit is verified before anyone's job depends on it. |
| Zillow Offers (2021) | Scaling a model into irreversible commitments without circuit breakers. Scale decisions on models that commit money need exposure limits and a kill threshold agreed in advance. |
| Replit agent (July 2025) | A pilot running with production write access. Pilots get production-scoped permissions, never borrowed or broad ones. |
All but McDonald's are in the Case Library, with mechanism and play.
Failure modes
Extended quarter after quarter with no named question. It consumes budget, blocks the team from better work and quietly becomes production without passing the gate.
Volunteers and champions produce results the median employee will not. Pilot cohorts are chosen to represent the target population, not to flatter the result.
Time saved enters the business case as cash. Without a conversion owner it is capacity, and capacity that is not redeployed is not a benefit.
Credits, trial pricing and sub-scale volumes make the run cost look trivial. The bill arrives at scale, after the commitment.
"We've invested too much to stop." The one-time cost is spent either way; the decision is about the next dollar.
The pilot stops and nobody writes down why. A year later another business unit pilots the same idea with the same vendor.
Evidence to request
| Document | What good looks like |
|---|---|
| Pilot charter | Dated before go-live; exit criteria per lens; baseline method; end date; budget |
| Results pack | Primary and paired metrics against the baseline, by cohort, with the comparison period and sample stated |
| Production cost model | Cost per transaction measured in the pilot, projected at production volume, at contracted prices, with run costs and a ceiling |
| Conversion statement | Signed by the owner of the budget or capacity: mechanism, rate, timing |
| Lens findings | Six written findings — block, condition or note — from the named owners |
| Learning record (on kill or pivot) | What was tested, what was found, what would make it worth revisiting |
Record and escalate
Every pilot decision produces a decision record: the four options considered, the lens findings, the economics with the break-even conversion rate, conditions with owners and dates, and the trigger that reopens the decision. Escalate to the AI Portfolio Council when a scale request exceeds the CAIO's delegated budget authority, when the use is high tier, or when the case includes a workforce effect. A block based on internal risk appetite that the sponsor wants accepted goes to whoever the risk-acceptance matrix in Process 09 names for its band; a block based on law, contract or a mandatory security boundary cannot be accepted at all. Report pilot outcomes — including kills — in the Monthly Portfolio Review; a portfolio that never kills anything over a long period deserves a look at whether it is being reviewed, but the test is the quality of the review, not the number of kills.
Questions to ask at the pilot review
Ask: When were these exit criteria written — before or after go-live? What was the baseline, and who measured it? What happened to the quality metric while the primary metric improved? Who has signed for converting the time saved, and how? What does one transaction cost at production volume and contracted price? What did the pilot use for credentials and data, and are those the ones production will use? If we extend, what single question will the extension answer, by when, and for how much?
Framework: The Six Lenses. Workflow: Experimentation and Production Transition and Stage-Gate Delivery. Doctrine: Portfolio System, Metrics, ROI & Benefits, AI Unit Economics & Inference Cost, Agent Governance by Autonomy Tier. Instruments: Instrument D: Portfolio Board, Instrument G: Benefits & Spend Tracker. Next decision: Approve a Production Launch for a pilot that scales, then the monthly portfolio review.